Skip to content

Pull requests: openshift/secondary-scheduler-operator

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

chore(deps): update secondary-scheduler-operator-4-13 to fd714db approved Indicates a PR has been approved by an approver from all required OWNERS files. backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. konflux-nudge lgtm Indicates that a PR is ready to be merged. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. verified Signifies that the PR passed pre-merge verification criteria
#752 opened Dec 7, 2025 by red-hat-konflux bot Loading…
1 task
ProTip! Follow long discussions with comments:>50.